15 Canary Street was approved for demolition in September, 2011, provided that the frame of the old house be incorporated into the frame of a wing to a new house to be built on the lot. Demolition began in December, 2011 and construction of a new house began in January, 2012.
Scroll down below the MACRIS form to view photographs of the reconstruction.
Reconstruction of the old house at 15 Dewey Ave, Sandwich, MA, photographed March 17, 20 and 22, 2012
- 15 Canary St ca-1974
- 01 – CanarySt_15-right-front 3/17
- 02 – CanarySt_15-left-front 3/17
- 03 – CanarySt_15-reconstruct-01
- 04 – CanarySt_15-post-to-foundation 3/17
- 05 – CanarySt_15-post-to-girts
- 06 – CanarySt_15-roof-joists
- 07 – CanarySt_15-old-damage 3/17
- CanarySt_15-Reconstruct-02 3/20
- CanarySt_15-Reconstruct-03 3/20
- CanarySt_15-Reconstruct-05 3/20
- CanarySt_15-Reconstruct-06 3/22
- Northwest Corner Post – Old and New 3/22
- Inside South Wall – All new wood. 3/22
- Inside North Wall – All new wood. 3/22
- Roof Joists and South Wall Beam 3/22
- Inside South Wall – All new wood. 3/22

















